Project Description

 
The Corrib Field, being developed by Shell, is a gas field located in 350 metres of water some 60 to 65 km off the County Mayo coastline. The field will be developed as a long-range subsea tieback to an onshore facility.

 

AE Global were contracted for the mechanical fabrication of Carbon Steel & Stainless Steel pipework for the new onshore terminal. This contract lasted for approx 20 months.