GSK Bromine Facility

Key Stats

Case Studies | Pharmaceutical & Life Sciences

GSK Bromine Facility: Precision Engineering for the Pharmaceutical Sector

GSK

Global pharmaceutical leader GSK required the construction of a new Bromine facility at their site in Montrose, Scotland. Projects in the pharmaceutical sector demand an exceptional level of precision, documentation, and adherence to stringent safety and quality standards. The client needed a partner capable of delivering an integrated M&E package with a focus on modularisation to optimise the project timeline and ensure minimal disruption to existing operations.

AE Global's Integrated Solution:

AE Global provided a fully integrated service package, from initial design input to final pre-commissioning. Our early engagement in the constructability and modularisation design phase was critical, allowing us to identify opportunities to build key components off-site, enhancing quality and project speed.

  • Our skilled professionals executed the complete installation of all piping, mechanical equipment, and the full Electrical & Instrumentation (E&I) scope.
  • We managed all system tie-ins to the existing plant with meticulous attention to detail, ensuring a seamless integration.
  • Our rigorous HSE&Q systems, including robust Risk Assessments and Method Statements (RAMS), were fundamental to delivering the project safely within a live, highly regulated pharmaceutical environment.

The Outcome:

AE Global successfully delivered this complex, multi-disciplinary project for GSK, showcasing our expertise in the demanding pharmaceutical sector. Our ability to design for modularisation and execute a seamless M&E and E&I installation resulted in a safe, efficient, and high-quality project delivery, reinforcing our position as a premier contractor for pharmaceutical facility construction.