Case Studies | Energy, Oil & gas
AE Global supported Oikos on the Aeris project at Canvey Island, delivering a significant mechanical and off-site modularisation scope within a live industrial storage environment. The project required constructability input, pipe fabrication, modular assembly, population, logistics planning and on-site installation.
Our team reviewed constructability, fabricated pipework off site, assembled and populated modular sections, and managed the logistics required to move works from fabrication through to installation.
By using off-site modularisation and early planning, AE Global helped reduce site congestion, improve installation efficiency and support a more controlled delivery process.
The project demonstrated AE Global’s ability to deliver large-scale mechanical and modularised solutions for complex industrial environments. Through practical planning, off-site fabrication and coordinated on-site installation, AE Global supported the successful delivery of a £6.5M project scope with greater control, efficiency and programme certainty.