DuPont Luxembourg – Tyvek L8

Key Stats

Case Studies | Industrial Manufacturing

AE Global provided specialist design, fabrication, and testing of high-pressure double-contained pipework for DuPont's £2.5M Tyvek L8 project.

DuPont Tyvek 1

AE Global supported DuPont Luxembourg on the Tyvek L8 project, delivering specialist design and mechanical support for high-pressure double-contained pipework. The project required detailed design input, constructability review, fabrication and testing to support a demanding process environment.

AE Global's Integrated Solution:

AE Global supported the project from detailed design and constructability through to fabrication and testing. Our team worked to ensure the double-contained pipework systems were accurately planned, constructible and fabricated to meet the technical requirements of the project.

By combining design knowledge, fabrication capability and practical mechanical expertise, AE Global helped manage the complexity of the jacketed pipework system and support a controlled route from detailing through to delivery.

The Outcome:

The project demonstrated AE Global’s capability in the delivery of specialist high-pressure and double-contained pipework systems. Through detailed technical detailing and controlled fabrication, AE Global supported the successful delivery of a complex mechanical scope for a critical industrial process environment.